This challenge was to build a double garage on a slopping and difficult site.

With a semi continuous pile retaining wall and predominantly concrete construction, it was a little different to a standard garage.

Plagued with design issues, we were able to identify the design faults at the start of this project, and to manage the process from a re-design through to completion.

Working closely with our designer and consultants, we were able to achieve the approvals required by council, despite the drastic height change and extra retaining works required to make the driveway accessible. 

We are extremely happy with the final outcome and managed to make something a little difficult, look very intentional along the way.